Get in Touch
Blog
  1. Home >
  2. Blog Detail

How much do i need to do copper mining

Apr 20, 2021

Jun 07, 2021 Copper mining waste storage piles may be as large as 1,000 acres and typically include three types of waste; tailings, dump and heap leach wastes, and waste rock and overburden. The amount of marketable copper produced is small compared to the original material mined. Several hundred metric tons of ore must be handled for each metric ton of

Get Price

Popular products

Hot Information